Define three separate requirements

Detection asks whether an event can be recognized. Location estimates where it occurred. Reporting latency specifies when an interpreted result becomes available. Write acceptance criteria for each. Continuous recording, accurate timing and a network interface are useful capabilities, but do not by themselves establish a complete real-time monitoring service.

Treat locations as estimates

The USGS explains how seismic arrival times and a velocity model are used to locate events, with uncertainty in both inputs affecting the result. Relative locations may resolve the arrangement of a cluster more clearly while its absolute position remains uncertain. Research on microseismic location also explicitly considers velocity-model uncertainty. Request uncertainty information with the event catalog.

Specify the full acquisition chain

Record the target volume, expected frequency range, surface or borehole access, station geometry and component requirements. Ask for a plan covering installation, timing, power, communications, storage, calibration and quality control. Clarify the role of a recorded-data node, a telemetry node and the downstream processing platform in the proposed equipment list.

Agree on operations and exception handling

Identify who reviews detections, checks locations and issues operational reports. Specify acceptable latency, periods of communications loss, data backfill, maintenance access and notification responsibilities. Any action thresholds must be established by the responsible project specialists using the applicable project requirements; this instrument guide does not supply universal alarm thresholds.

Use a trial to test the deliverable

Before full deployment, request a representative acquisition and processing trial. Review the waveform files, timing records, event-catalog fields, uncertainty descriptions and report delivery time. Compare the results with the agreed requirements. The Jiangsu geothermal case provides acquisition context, while its reported event count is specific to that project.

Continue with your project

Discuss acquisition requirements

Sources and product information

Product values are drawn from the linked SmartSolo catalog entries. Ask for the latest datasheet for the exact configuration. External sources provide technical background and do not imply endorsement of this guide.

Contact us about a technical detail.

Related instruments

Build the right system for your project

Share your application, quantities and timeline. Request a project quotation or technical information.

Discuss Your Project