SmartSolo ScientificInstruments for research, exploration & monitoringDiscuss your project
Natural frequency · SELECTION GUIDE

2 Hz vs 5 Hz Geophone Nodes

Use the target signal band and the complete sensor response to compare 2 Hz and 5 Hz nodes. Natural frequency alone does not define usable bandwidth or guarantee greater investigation depth.

SmartSolo Scientific · Updated

The values below describe representative IGU-16HR 3C configurations in the linked English specifications. They do not describe every 2 Hz or 5 Hz sensor on the market.

Compare the requirements

On a narrow screen, scroll the table horizontally to see every column.

2 Hz vs 5 Hz Geophone Nodes — selection reference
Published itemIGU-16HR 3C 2HzIGU-16HR 3C 5Hz
Seismic channels33
Sensor natural frequency2 Hz5 Hz
Weight, including battery and spike5.4 kg2.4 kg
Storage in the cited specification64 GB; expandable to 128 GB64 GB
Continuous operation at 25 °C, 2 ms interval40 days30 days
What still needs confirmation?Response curve, noise, any extended-response processing, and site coupling.Response curve, noise, target-band performance, and site coupling.

Start with the lowest useful signal frequency

If low-frequency observations are central to the project, include the 2 Hz model in a response and noise comparison. If the method uses a higher band, also assess the lighter 5 Hz model against field logistics. Neither label determines the final depth or resolution of an interpreted section.

Do not confuse extended response with a flat native response

The 2 Hz brochure also describes an extended low-frequency response. Before relying on it, request the applicable response file, processing assumptions and noise information. This comparison keeps the 2 Hz natural-frequency value separate from a broadband bandwidth specification.

Compare the complete deployment

For large station counts, carrying weight, battery servicing and download throughput may influence the workable layout. Request the same recording mode and temperature assumptions for all candidates; the published figures are planning references rather than a site-specific endurance guarantee.

English specifications used here

Figures refer to these document editions. Confirm the latest specification and the exact configuration with your quotation.

Explore the instruments

Plan the application

Documented field examples

These accounts describe their cited projects. They do not prescribe a configuration for a different site.

Continue your comparison